Modular Home Delivery: Arrival and Installation
Logistics

Modular Home Delivery: Arrival and Installation

AB
Andreea B.
Client Experience Lead
October 27, 2026
4 min read

A BioBuilds home travels to your plot as finished modules on low-loader trucks, usually within 1 to 5 business days of leaving the factory. It is inspected on the trailer, then a crane you arrange lifts the modules onto the prepared foundation. Installation takes around 3 days with BioBuilds' assembly partners, followed by agreed finishing work. For delivery day to run smoothly, the foundation, access route, crane position and utility connections must be ready.

Delivery day is the shortest part of building a modular home and the most visible one. A BioBuilds home arrives in factory-built modules that are lifted onto the prepared foundation on delivery day. Behind that speed is preparation: the route, the crane, the foundation and the connections must be ready before the trucks leave. This guide walks through the weeks before, the day itself and the days after, and lists what you arrange and what BioBuilds coordinates.

1–5 business days
typical transit from the factory to your site, depending on distance
~3 days
installation with BioBuilds' assembly partners, then agreed finishing work
10%
final payment, due at delivery after inspection on the trailer

What has to be ready before delivery?

Ready before the trucks leave the factory
  • The foundation: ground screws, a slab or another agreed foundation, built and measured to the drawings.
  • Access: a route a low-loader truck can drive and turn on, checked for width, bends, gradients, weight limits, overhead cables and trees.
  • The crane: booked by you, sized to the lifting requirements BioBuilds provides, with a firm, level position close enough to the foundation.
  • Permits: any road closure or special transport permits the route needs.
  • Utilities: water, wastewater and electricity brought to the connection points.
  • The final payment: ready to release once you have inspected the home on the trailer.

The crane is easy to underestimate. Its size depends on the weight of the modules and the distance from the crane to the far side of the foundation, so a crane that can stand close to the house is smaller and cheaper. BioBuilds' site-cost data gives a mobile crane with road closure from €3,600, including an illustrative 19% German VAT; the price for your site depends on access and reach. Our plot checklist covers access in detail.

What happens on delivery day?

Arrival
The trucks arrive with the modules, wrapped for transport. Oversized loads may travel with an escort, depending on the route.
Inspection
The home is inspected on the trailer before unloading. The final 10% falls due when the home is available at your destination.
Lifting
The crane lifts each module from the trailer and sets it on the foundation, in the order given by the drawings.
Joining
The assembly team aligns the modules, connects them structurally and closes the joints between them.
Weatherproofing
Roof and facade joints are sealed so the house is weathertight within days.

What happens in the days after?

BioBuilds plans around 3 days for installation with its assembly partners, followed by agreed finishing work. On-site assembly is arranged by the client with BioBuilds' local partners at no extra cost. Your licensed contractors connect water, wastewater and electricity. With Turnkey, the interior arrives finished; with Exterior Finished, your interior work starts once the house is closed and connected.

Key Takeaway

The crane and the access route decide whether delivery day takes hours or turns into a problem. Check both before you sign, not the week before delivery.

What does BioBuilds arrange and what do you arrange?

BioBuildsYou
Builds and inspects the home in the factoryPrepare the foundation with licensed contractors
Organizes insured transport, quoted for your destinationBook the crane, using BioBuilds' lifting requirements
Provides lifting requirements and the installation documentationArrange any road closure and special transport permits needed
Coordinates installation with its assembly partnersArrange assembly with BioBuilds' local partners, at no extra cost
Completes the agreed finishing workConnect utilities through licensed contractors

Transport is quoted separately for your destination, except in Ireland, where it is included. To plan your project and see the price of your home, configure it.

Frequently Asked Questions

BioBuilds modules travel on low-loader trucks and usually reach your site within 1 to 5 business days of leaving the factory, depending on distance. At the site, the home is inspected on the trailer, then a crane lifts each module onto the prepared foundation, and the assembly team joins and seals the modules.
The modules are set on the foundation on delivery day. BioBuilds plans around 3 days of installation with its assembly partners, followed by agreed finishing work. Utility connections and any interior work for Exterior Finished follow on their own schedule.
The crane is a site cost. You book it, using the lifting requirements BioBuilds provides. Its size and price depend on the module weight and the distance from the crane to the foundation; BioBuilds' site-cost data gives a mobile crane with road closure from €3,600, including an illustrative 19% German VAT.
A route a low-loader truck can drive and turn on, without low cables, tight bends, weight limits or overhanging trees, and a firm, level crane position close to the foundation. Check it before you sign, because the crane size depends on the distance to the foundation.
AB
Andreea B.
Client Experience Lead
Certified Passive House Consultant with 8 years experience in timber-frame construction and prefabricated housing. Helping families across Europe build smarter, healthier homes.

Ready to build your Passivhaus?

Configure your modular home online and get an instant price estimate.

Configure your home